Services
Interior and exterior finishing services
Nine services, each with its own page: what is included, styles and options, how the work runs, typical timelines and price guidance. Pick the one closest to your job; if it spans several, start with renovations and project management.
-
Interior Design and Space Planning
Most expensive mistakes in a Nairobi home happen before the work starts: a sofa that blocks the balcony door, a TV wall facing the afternoon sun, a kitchen island with no room to open the oven.
- Timeline: 1 to 3 weeks for the design stage
- Rooms: Living room, Bedroom, Office
-
Home and Apartment Décor
A decorated home is not the same as a renovated one.
- Timeline: 1 to 2 weeks from approval
- Rooms: Living room, Bedroom
-
Office and Commercial Interiors
A commercial interior has a job to do.
- Timeline: 3 to 8 weeks depending on size
- Rooms: Office, Shop and restaurant
-
Kitchen and Bathroom Design
Kitchens and bathrooms are the two rooms where design, plumbing, electrical and carpentry all meet, which is why they go wrong when handled by separate people.
- Timeline: 3 to 6 weeks including fabrication
- Rooms: Kitchen, Bathroom
-
Wall Painting, Wallpaper and Feature Walls
Good paintwork is 70 percent preparation.
- Timeline: 2 to 6 days for a typical apartment
- Rooms: Living room, Bedroom, Office, Shop and restaurant
-
Ceiling Design, Lighting and Flooring
The ceiling and the floor are the two largest surfaces in any room, and lighting sits between them.
- Timeline: 1 to 3 weeks depending on the number of rooms
- Rooms: Living room, Bedroom, Office, Shop and restaurant
-
Furniture Selection and Installation
Furniture is where most décor budgets go, and where most regret comes from: a sofa too deep for the room, a wardrobe that does not reach the ceiling, a dining table that seats six only if nobody moves.
- Timeline: 2 to 4 weeks for custom pieces
- Rooms: Living room, Bedroom, Office
-
Curtains, Blinds, Rugs and Accessories
Curtains and blinds change a room faster than anything else, and they are the item most often done badly: rods hung at window height instead of near the ceiling, curtains that stop short of the floor, blinds that let the 4 pm sun straight through.
- Timeline: 7 to 10 days from measurement to fitting
- Rooms: Living room, Bedroom, Office
-
Renovations and Project Management
A renovation involves at least six trades: demolition, masonry, plumbing, electrical, carpentry and painting, plus tiling, ceilings and glazing on most jobs.
- Timeline: 4 to 16 weeks depending on scope
- Rooms: Living room, Bedroom, Kitchen, Bathroom, Office, Shop and restaurant
Not sure which service you need?
Describe the space and the problem; we will tell you what it involves and roughly what it costs.