Services

Interior and exterior finishing services

Nine services, each with its own page: what is included, styles and options, how the work runs, typical timelines and price guidance. Pick the one closest to your job; if it spans several, start with renovations and project management.

  1. Interior Design and Space Planning

    Most expensive mistakes in a Nairobi home happen before the work starts: a sofa that blocks the balcony door, a TV wall facing the afternoon sun, a kitchen island with no room to open the oven.

    • Timeline: 1 to 3 weeks for the design stage
    • Rooms: Living room, Bedroom, Office
  2. Home and Apartment Décor

    A decorated home is not the same as a renovated one.

    • Timeline: 1 to 2 weeks from approval
    • Rooms: Living room, Bedroom
  3. Office and Commercial Interiors

    A commercial interior has a job to do.

    • Timeline: 3 to 8 weeks depending on size
    • Rooms: Office, Shop and restaurant
  4. Kitchen and Bathroom Design

    Kitchens and bathrooms are the two rooms where design, plumbing, electrical and carpentry all meet, which is why they go wrong when handled by separate people.

    • Timeline: 3 to 6 weeks including fabrication
    • Rooms: Kitchen, Bathroom
  5. Wall Painting, Wallpaper and Feature Walls

    Good paintwork is 70 percent preparation.

    • Timeline: 2 to 6 days for a typical apartment
    • Rooms: Living room, Bedroom, Office, Shop and restaurant
  6. Ceiling Design, Lighting and Flooring

    The ceiling and the floor are the two largest surfaces in any room, and lighting sits between them.

    • Timeline: 1 to 3 weeks depending on the number of rooms
    • Rooms: Living room, Bedroom, Office, Shop and restaurant
  7. Furniture Selection and Installation

    Furniture is where most décor budgets go, and where most regret comes from: a sofa too deep for the room, a wardrobe that does not reach the ceiling, a dining table that seats six only if nobody moves.

    • Timeline: 2 to 4 weeks for custom pieces
    • Rooms: Living room, Bedroom, Office
  8. Curtains, Blinds, Rugs and Accessories

    Curtains and blinds change a room faster than anything else, and they are the item most often done badly: rods hung at window height instead of near the ceiling, curtains that stop short of the floor, blinds that let the 4 pm sun straight through.

    • Timeline: 7 to 10 days from measurement to fitting
    • Rooms: Living room, Bedroom, Office
  9. Renovations and Project Management

    A renovation involves at least six trades: demolition, masonry, plumbing, electrical, carpentry and painting, plus tiling, ceilings and glazing on most jobs.

    • Timeline: 4 to 16 weeks depending on scope
    • Rooms: Living room, Bedroom, Kitchen, Bathroom, Office, Shop and restaurant

Not sure which service you need?

Describe the space and the problem; we will tell you what it involves and roughly what it costs.